Pages

Home Page

I-40 Bridge Replacement

WCS teamed up with the Tennessee Department of Transportation and Barnhart Crane to help with the Fast Fix 8 bridge repair project. Many oversize loads were hauled in with the

Read More »

Oversize Load Wind Tower Blade Transport

Two oversize loads hauling several wind tower blades each made a successful move last night.  WCS worked on the oversize load permits for the Environmental Transportation load headed from Adelanto to Desert Hot

Read More »

I-10 Open in Both Directions

Interstate 10 is now open in both directions for all travel, including oversize loads up to 16-feet wide, which will be the maximum width allowed for all oversize loads traveling

Read More »