WCS teamed up with the Tennessee Department of Transportation and Barnhart Crane to help with the Fast Fix 8 bridge repair project.
Many oversize loads were hauled in with the heavy equipment needed to complete the work. Loaded buy naltrexone usa dimensions of those moves reached 139-feet in length and almost 17-feet wide with a total weight of 457,760 pounds on 20 axles.
Check out the time lapse: